Go to GreenTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
LCA Conventional Orange Crop Outcomes

Resource Stock Outcome Analyzer Views

Progress

Introduction
This tool generates a variety of resource stock output stock statistics for DevTreks outcomes.

Calculation View Description
v210a

Version: 1.9.0

Feedback About carbon/outcomegroup/LCA Conventional Orange Crop Outcomes/39/outcomesbprogress1

Step 1 of 3. Make Selections


Display Full View:

Stocks to Analyze

Choose up to 10:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Make sure the data being analyzed corresponds to outcomes.
  • Step 1. Analysis Type: Choose the type of analysis to run. Ensure that it coincides with the name of the analyzer being used.
  • Step 1. Stocks to Analyze: Choose up to 10 resource stock properties to analyze.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Math Properties: Choose optional algorithms and subalgorithms. Refer to the CTA tutorial for options.
  • Step 2. Media URL: Delimited string of Media URLs that explain the analysis.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying NPV calculator after inserting, deleting, or updating, this linked view (that keeps the NPV calculator's linked views synchronized with these linkedviews).


Current view of document
LCA Conventional Orange Crop Outcomes
Outcome Group : LCA Conventional Orange Crop Outcomes ; A100C
Outcome AllAlt. 0Alt. 1Alt. 2
Name 2012 Conventional Orange Crop Outcome2013 Conventional Orange Crop Outcome2014 Conventional Orange Crop Outcome
Date 12/31/201212/31/201312/31/2014
Label A1001C2012A1001C2013A1001C2014
Indicators AllAlt. 0Alt. 1Alt. 2
Target benchmarkactualactual
Date 12/31/201212/31/201312/31/2014
Score Observations 1.01.01.0
Score Plan Period 1,300.65401,254.67071,375.7550
Score Unit meanmeanmean
Score Plan Full 1,300.65400.00000.0000
Score Plan Cumul 1,300.65400.00000.0000
Score Actual Period 0.00001,254.67071,375.7550
Score Actual Cumul 0.00001,254.67072,630.4257
Score Actual Period Change 0.00000.00000.0000
Score Actual Cumul Change 0.00001,254.67072,630.4257
Score Plan P Percent 0.0000100.0000100.0000
Score Plan C Percent 0.00000.00000.0000
Score Plan Full Percent 0.00000.00000.0000
Score Low Plan Period 1,298.53601,252.50471,373.3125
Score Low Unit lower 90% cilower 90% cilower 90% ci
Score Low Plan Full 1,298.53600.00000.0000
Score Low Plan Cumul 1,298.53600.00000.0000
Score Low Actual Period 0.00001,252.50471,373.3125
Score Low Actual Cumul 0.00001,252.50472,625.8172
Score Low Actual Period Change 0.00000.00000.0000
Score Low Actual Cumul Change 0.00001,252.50472,625.8172
Score Low Plan P Percent 0.0000100.0000100.0000
Score Low Plan C Percent 0.00000.00000.0000
Score Low Plan Full Percent 0.00000.00000.0000
Score High Plan Period 1,302.77201,256.83671,378.1975
Score High Unit upper 90% ciupper 90% ciupper 90% ci
Score High Plan Full 1,302.77200.00000.0000
Score High Plan Cumul 1,302.77200.00000.0000
Score High Actual Period 0.00001,256.83671,378.1975
Score High Actual Cumul 0.00001,256.83672,635.0342
Score High Actual Period Change 0.00000.00000.0000
Score High Actual Cumul Change 0.00001,256.83672,635.0342
Score High Plan P Percent 0.0000100.0000100.0000
Score High Plan C Percent 0.00000.00000.0000
Score High Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name NitrogenNitrogenNitrogen
Label NNN
Plan Period 2,401.51002,281.43452,501.8875
Unit kg N / tonkg N / tonkg N / ton
Plan Full 2,401.51000.00000.0000
Plan Cumul 2,401.51000.00000.0000
Actual Period 0.00002,281.43452,501.8875
Actual Cumul 0.00002,281.43454,783.3220
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.00002,281.43454,783.3220
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Observations 1.01.01.0
Name PhosphorousPhosphorousPhosphorous
Label PPP
Plan Period 235.8360236.5291294.2125
Unit kg P / tonkg P / tonkg P / ton
Plan Full 235.83600.00000.0000
Plan Cumul 235.83600.00000.0000
Actual Period 0.0000236.5291294.2125
Actual Cumul 0.0000236.5291530.7416
Actual Period Change 0.00000.00000.0000
Actual Cumul Change 0.0000236.5291530.7416
Plan P Percent 0.0000100.0000100.0000
Plan C Percent 0.00000.00000.0000
Plan Full Percent 0.00000.00000.0000
Dataset: LCA Conventional Orange Crop Outcomes IRI These outcomes use life cycle analysis for conventional orange production.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.